User Tools

Site Tools


bukit_panjang

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
bukit_panjang [2024/09/04 12:43] – [1900: Sekolah Bukit Panjang] sazlibukit_panjang [2024/09/12 22:00] (kini) – [1965: Peta Sekitar Jeram - Bukit Panjang] sazli
Line 124: Line 124:
  
 //"P.W.D. Head Office, Kuala Lumpur, 1st April 1903. No: 507/1903. S.R. 757/1903. Re Cooly Lines and overseers quarters at Bukit Panjang. Sir, With reference to S.R. 757/1903, I have the honour to report that the Executive Engineer Kuala Selangor now sends in a revised plan and estimate for cooly lines and overseers quarters, Item 8, page 51, Kuala Selangor, at Bukit Panjang. 2. He reports that 'The only site available for these buildings is at the bifurcation of Bukit Panjang and Bukit Chelaka roads, 2 miles from Simpang Ampat. The land is low lying and is usually covered with 1 foor 6 inches to 2 feet of water during the rainy season'. The amended plan shows the floor level raised 3 feet 6 inches above the ground for this reason. 3. The estimate for the work as amended is $2500 and Contractor Qua Pong agrees to take up the work at this price, which is the amount of his tender for the original plan. 4. The Executive Engineer recommends that Qua Pong be given the contract for the work as revised as he is the only man in the district able to do it and to save time in calling for fresh tenders. - S.H. Wallish(?), Ag. State Engineer, Selangor."// (Arkib Negara 1957/0107075W, 02/02/1903: {{ :arkib:19570107075d02.pdf ||}}[[https://ofa.arkib.gov.my/ofa/group/asset/193840|"TENDER :- COOLY LINES AND OVERSEERS QUARTERS AT BUKIT PANJANG ROAD"]]). //"P.W.D. Head Office, Kuala Lumpur, 1st April 1903. No: 507/1903. S.R. 757/1903. Re Cooly Lines and overseers quarters at Bukit Panjang. Sir, With reference to S.R. 757/1903, I have the honour to report that the Executive Engineer Kuala Selangor now sends in a revised plan and estimate for cooly lines and overseers quarters, Item 8, page 51, Kuala Selangor, at Bukit Panjang. 2. He reports that 'The only site available for these buildings is at the bifurcation of Bukit Panjang and Bukit Chelaka roads, 2 miles from Simpang Ampat. The land is low lying and is usually covered with 1 foor 6 inches to 2 feet of water during the rainy season'. The amended plan shows the floor level raised 3 feet 6 inches above the ground for this reason. 3. The estimate for the work as amended is $2500 and Contractor Qua Pong agrees to take up the work at this price, which is the amount of his tender for the original plan. 4. The Executive Engineer recommends that Qua Pong be given the contract for the work as revised as he is the only man in the district able to do it and to save time in calling for fresh tenders. - S.H. Wallish(?), Ag. State Engineer, Selangor."// (Arkib Negara 1957/0107075W, 02/02/1903: {{ :arkib:19570107075d02.pdf ||}}[[https://ofa.arkib.gov.my/ofa/group/asset/193840|"TENDER :- COOLY LINES AND OVERSEERS QUARTERS AT BUKIT PANJANG ROAD"]]).
 +
 +===== 1965: Peta Sekitar Jeram - Bukit Panjang =====
 +
 +{{:peta:6604_malaysia_selangor_jeram_25k_93b_master.jpg?900|Peta sekitar Jeram - Bukit Cherakah, 1965}} \\
 +Peta sekitar Jeram - Bukit Panjang (1965) (Surveyor General, Federation of Malaya, 1965 @ Australian National University: {{ :laman:malaysia_selangor_jeram_standard_mapping_series_sheet_93b_1965_1_25_000.pdf ||}}[[http://hdl.handle.net/1885/155042|"Malaysia, Selangor, Jeram, Standard Mapping Series, Sheet 93b, 1965, 1:25 000"]]).
  
bukit_panjang.1725425034.txt.gz · Last modified: 2024/09/04 12:43 by sazli